Wind Turbine Generator

TowerUp Wind Turbine Generator Tower Base Stand Mount Foundation Easy Up & Down


TowerUp Wind Turbine Generator Tower Base Stand Mount Foundation Easy Up & Down
TowerUp Wind Turbine Generator Tower Base Stand Mount Foundation Easy Up & Down
TowerUp Wind Turbine Generator Tower Base Stand Mount Foundation Easy Up & Down
TowerUp Wind Turbine Generator Tower Base Stand Mount Foundation Easy Up & Down
TowerUp Wind Turbine Generator Tower Base Stand Mount Foundation Easy Up & Down
TowerUp Wind Turbine Generator Tower Base Stand Mount Foundation Easy Up & Down
TowerUp Wind Turbine Generator Tower Base Stand Mount Foundation Easy Up & Down

TowerUp Wind Turbine Generator Tower Base Stand Mount Foundation Easy Up & Down    TowerUp Wind Turbine Generator Tower Base Stand Mount Foundation Easy Up & Down

The One Man Wind Turbine Raising System. Innovative Wind Turbine Foundation that allows tower to be raised or lowered with ONE single operator in 90 seconds.

TowerUp - The One Man Wind Turbine Raising System. Video will open in a new window. What is TowerUp and why do we need it?

TowerUp is the most mechanically advanced wind turbine foundation available to date. It integrates a lifting mechanism that allows a single operator to easily raise up/down a wind turbine within 90 seconds. Our system eliminates the hassle of a large crew and cumbersome equipment. This makes regular maintenance, upgrades and repair an easy task. No more frustrations during hurricane season!

While everyone else spend hours struggling to get their turbines to the ground, you simply lower yours in minutes to avoid the storm! TowerUp comes with Platform, Plateau and the Lifting Mechanism.

Schedule 40 Pipe (Tower) is not included. Pipes are available at your local hardware store. One-man operation : Eliminates expense for a large crew, heavy equipment, tension cables, Cranes, Pulleys and Trucks. Rapid Performance : Raise and lower tower within 90 seconds VS a few hours without. Non-Physically Demanding : Operator does not have to be strong.

Repays itself in ONE hurricane season. Advance Lifting Mechanism : Eliminates most of the physical labor in raising and lowering the turbine. Self-Lock Handle : Handle bar has built-in automatic load holding brake and will not spin out of control if you leave the turbine half-raised. Severe Weather Emergency Response : Tower can be lower when wind turbine is actively spinning during storm, prevent damage and save your wind turbine during hurricane season. ALL personnel must stay CLEAR from rotating turbine blades until they come to a complete stop.

We assume no liability for any injuries caused by rotating blades. Super Compact : Unlike others, our system has minimum foot print and allows installation at location with limited space. Large Crew Needed : You will have to pay people to help, and are they available when the hurricane hits? Time Consuming : Scheduling people could get ugly, spending hours on the field during a storm is not safe either. Physically Demanding : Strong men needed for heavy lifting.

Safety : Someone in the illustration above is going to get hurt. Severe Weather Emergency Response : Not happening.

It is time to replace the damaged wind turbine. After the initial purchasing price of TowerUp and your choice of wind turbine plus S&H / installation cost, every subsequent raising and lowering of the wind turbine will be free. So TowerUp literally pays for itself after the first year. The above table shows how heavy of a turbine TowerUp can support at a given length of tower height. Below are specification of TowerUp.

Lifting Mechanism Loading Capacity: 1000kg Maximum Tower Height: 33' (10m) Maximum Turbine Weight: Refer to table above Material: Steel Corrosion Resistance: Anti-Rust Paint Diameter of Tower Support on Platform: Precisely 74.5mm Recommended Tower (Pipe) Specification: Schedule 40 2 1/2" Pipe (73mm), 5.79lb/ft, 0.2" thick Weight of System: 130lbs. Dig a hole with a dimension of 80 x 80 x 80 cm. Build a metal cube with dimension 60 x 60 x 60 cm using 12x 80cm x10mm steel rods. Make a card board with 8 holes matching the metal base. Fill the hole with 10 cm of concrete and put the 60 cm metal cube in the center. Stabilize the 8 anchor bolts into the hole with the card board we made in step 4, make sure the threaded part of the bolts is protruding above ground level. Continue filling the hole with concrete for 15 cm. Build a number sign "#" with 4x 80cm x 10mm steel rod, the square of the number sign should measure 30 x 30 cm and should be at the center. Stick 4x 80cm x 10mm metal rod vertically at the corners of the 30 x 30 square. Make sure these rods do not stick out above ground by hammering them down. Continue filling 30cm of concrete. Build a 2nd 30 x 30cm number sign "#".

Fill up concrete until level with ground. Wait 2 weeks for the concrete to dry (actual wait time will depend on the grade of your concrete). Place the plateau on the surface of the concrete foundation, with the end of 8 anchor bolts going thru the plateau. Secure the plateau to the 8 anchor bolts with washers and hex nuts.

Why do I have to build metal frame (cube) with steel rods? The metal rods are to reinforce the concrete. Without these rods, your foundation will be very brittle and will not last long. I don't have enough space, can I dig a smaller hole? Yes, in the above demo pictures, our foundation is not 80cm cubed.

It is 100 x 50 x 50 cm. You just need to scale you metal frame accordingly. NO OPERATING COST GENERATES ELECTRICITY FROM THE ABUNDANT RESOURCE. TowerUp Wind Turbine Generator Base Stand Mount Heavy Duty Foundation System. All pictures and descriptions are subjected to change without notice.

We are not responsible for any inadvertent errors. Extended Area Surcharge: For Address that our couriers determined to be outside of their normal service area, they will charge an additional "extended area surcharge". Spams and mass e-mailing will be deleted without slightest glance.

E-mails with virus or anything subjected to hacking are automatically deleted. The item "TowerUp Wind Turbine Generator Tower Base Stand Mount Foundation Easy Up & Down" is in sale since Monday, October 1, 2018. This item is in the category "Home & Garden\Home Improvement\Electrical Supplies\Alternative Energy Supplies\Wind Power Supplies\Wind Turbines & Kits". The seller is "hi_iq" and is located in Point Roberts, Washington. This item can be shipped worldwide.
  1. MPN: Does Not Apply
  2. Brand: GreenergyStar

TowerUp Wind Turbine Generator Tower Base Stand Mount Foundation Easy Up & Down    TowerUp Wind Turbine Generator Tower Base Stand Mount Foundation Easy Up & Down